Client: |
Based upon a district wide prototype, the Vista Ridge High School Auditorium project was an addition to an existing 2,500 student high school campus. Constructed out of insulated concrete tilt-wall panels and concrete masonry units, the 420 seat auditorium and outdoor plaza seamlessly blend into its surroundings and was designed to host a variety of events such as school plays, band & orchestra performances as well as district wide administrative conferences. The auditorium is equipped with the latest sounds, lighting and stage equipment as well as light and sound control rooms, make-up room, dressing rooms, wardrobe room and scene shop.
Construction Cost: $8,826,866 Completion Date: January 15, 2010 Engineering Consultants: MEP Engineering, Inc., Pickett Kelm & Associates, PBS&J, Russ Bragg Landscape Architects, Austech Roof Consultants |